主管:国家卫生健康委员会
主办:国家卫生健康委医院管理研究所
中国科技核心期刊(中国科技论文统计源期刊)
中国科学引文数据库(CSCD)核心库期刊
《中文核心期刊要目总览》核心期刊

中国护理管理 ›› 2020, Vol. 20 ›› Issue (5): 787-791.doi: 10.3969/j.issn.1672-1756.2020.05.030

• 专科管理 • 上一篇    下一篇

缺血性脑卒中患者“一站式多模态”CT检查流程优化的研究

汪爱丹 南丽杰 郭道德 王胜奇 卢洁   

  1. 首都医科大学宣武医院放射科、磁共振成像脑信息学北京市重点实验室,100053 北京市(汪爱丹,南丽杰,郭道德,卢洁);急诊科(王胜奇);核医学科(卢洁)
  • 出版日期:2020-05-15 发布日期:2020-05-15
  • 通讯作者: 卢洁,博士,主任医师,教授,E-mail:lujee2003@163.com E-mail:E-mail:984969491@qq.com
  • 作者简介:汪爱丹,本科,护师,E-mail:984969491@qq.com
  • 基金资助:
    北京市自然科学基金资助项目(Z190014);北京市医院管理局“登峰”计划专项经费资助项目(DFL20180802)

Study on the optimization of "one-stop multi-modal" CT examination procedure in patients with ischemic stroke

WANG Aidan, NAN Lijie, GUO Daode, WANG Shengqi, LU Jie   

  1. Radiology Department, Beijing key Lab of MRI and Brain Informatics, Xuanwu Hospital, Capital Medical University, Beijing, 100053, China
  • Online:2020-05-15 Published:2020-05-15
  • Contact: E-mail:lujee2003@163.com E-mail:E-mail:984969491@qq.com

摘要: 目的:分析“一站式多模态”CT检查流程优化对缩短患者就诊至应用静脉溶栓药时间(DNT)、提升缺血性脑卒中救护质量的效果。方法:选取2015年12月至2018年3月在某三级甲等医院就诊并进入脑卒中溶栓绿色通道患者145例,分为对照组和实验组。实验组进行流程优化,采用“并联模式”并删减耗时环节,比较流程优化前后患者各关键环节用时、DNT、患者预后及护理满意度。结果:流程优化后实验组患者就诊至完成CT检查时间、DNT较对照组明显缩短(P<0.001);护理满意度明显提升(P<0.05);住院时间明显缩短(P<0.001)。结论:“一站式多模态”CT检查流程优化提升了缺血性脑卒中患者救护质量,缩短了DNT,提高了患者护理满意度。

关键词: 缺血性脑卒中;静脉溶栓;流程优化;一站式

Abstract: Objective: To analyze the effect on shortening Door-to-Needle Time (DNT) and improving the quality of ischemic stroke treatment by optimizing the “one-stop multi-modal” CT examination process. Methods: 145 patients admitted to a tertiary grade A hospital from December 2015 to March 2018 were divided into control group and experimental group. The experimental group carried out process optimization, adopted "parallel mode" and cut the time-consuming parts. The time of different steps, DNT, patient prognosis and nursing satisfaction were compared before and after process optimization. Results: After the process optimization, the Door-to-CT time and DNT was significantly shorter in the experimental group than the control group (P<0.001). The nursing satisfaction was significantly improved (P<0.05), and hospital stay was significantly shortened (P<0.001). Conclusion: "One-stop multi-modal" CT examination process optimization improves the quality of ischemic stroke treatment, shortens DNT, and improves patient nursing satisfaction.

Key words: ischemic stroke; intravenous thrombolysis; treatment process optimization; one-stop

中图分类号: 

  • R47